| We level ground by using "cut & fill" method. Grade for adequate drainage around pad site. Pour reinforced concrete pad 4-5" thick with integrated footer at a depth of 30" . Plastic barrier, anchor straps included. Area disturbed will be larger than shed size. Additional charges may apply. |
 |
|
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|
| We level the ground by using "cut & fill" method. Grade for adequate drainage. Drill 12" holes to dept of 30", place 8" Sonotube & fill with concrete. Place piers to connect with 4x4 skids. Area disturbed will be larger than shed size. Additional charges may apply. |
 |
|
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|
| We use the Cut & Fill method to level ground for pad, place heavy-duty filter cloth & 3"-4" of gravel on top of filter cloth. Grade around pad to provide for adequate drainage from structure. Finished pad with be 1-2' larger per side than shed dimensions, area disturbed will be greater. We do not provide fill dirt. |
 |
|
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|
| We use the Cut & Fill method to level ground for pad, place heavy-duty filter cloth & 3"-4" of wood chips on top of filter cloth. Grade around pad to provide for adequate drainage from structure. It is recommended to extend the pad dimensions by 6' at the base of slides and swing area. Please figure this area into the total square footage of pad site. We do not provide fill dirt. |
 |
|
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|