Register | Log In
Site Prep > Concrete Piers > 

Site Prep-Piers.jpg
 
We level the ground by using "cut & fill" method. Grade for adequate drainage. Drill 12" holes to dept of 30", place 8" Sonotube & fill with concrete. Place piers to connect with 4x4 skids. Area disturbed will be larger than shed size. Additional charges may apply.



***PRICE IS PER PIER***
Site Preparation-Footings/piers Level ground by using "cut & fill" method. Grade for adequate drainage. Drill 12" holes to dept of 30", place 8" Sonotube & fill with concrete. Place piers to connect with 4x4 skids. Area disturbed will be larger than shed size. Additional charges may apply.

***PRICE IS PER PIER***
$100.00  
Concrete Piers for Modular Horse Barn (18" dia x 36" deep) Concrete Piers for Modular Horse Barn (18" dia x 36" deep) $225.00