|
|
| Gravel Site Preparation
|
| |
| We use the Cut & Fill method to level ground for pad, place heavy-duty filter cloth & 3"-4" of gravel on top of filter cloth. Grade around pad to provide for adequate drainage from structure. Finished pad with be 1-2' larger per side than shed dimensions, area disturbed will be greater. We do not provide fill dirt. |
|
|
|
|
|
|