Register | Log In  My Account   FAQS  Help  0 items ($0.00)

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat...

More testimonials

Related Items
Site Prep - Monolythic Slab.jpg Site Preparation-Concrete slab-Monolithic pour
Level ground by using "cut & fill" method. Grade for adequate drainage around pad site. Pour reinforced concrete pad 4-5" thick with integrated footer at a depth of 30" . Plastic barrier, anchor straps included. Area disturbed will be larger than shed size. Additional charges may apply.

***PRICE IS PER SQUARE FOOT***MINIMUM OF $1000.
Price: $15.00
 
Site Prep-Piers.jpg Site Preparation-Footings/piers
Level ground by using "cut & fill" method. Grade for adequate drainage. Drill 12" holes to dept of 30", place 8" Sonotube & fill with concrete. Place piers to connect with 4x4 skids. Area disturbed will be larger than shed size. Additional charges may apply.

***PRICE IS PER PIER***
Price: $100.00
 
concrete pad.jpg Site Preparation-Concrete slab-form pour
Level ground by using "cut & fill" method. Grade for adequate drainage around pad site. Place forms at perimeter, plastic vapor barrier, pour 4-5" of steel reinforced concrete. Area disturbed will be larger than shed size. Additional charges may apply.

***PRICE IS PER SQUARE FOOT***
Price: $12.00